Total Overhaul of Aerators by JRS

2 min read time

A complex overhaul of aerators successfully completed — safely and efficiently executed. JRS carried out a full mechanical overhaul of aerators at a client’s site.

 

Access to the equipment was limited, requiring our team to use a boat and crane to remove the aerators from the bio tank. The units were seized and the electric motors were in degraded condition. The aerators were fully refurbished — including a complete E-motor revision — and reinstalled by JRS, ready for reliable operation once again.

Our related

news

2 min read

Jubail Facility welcomes Dutch ambassador

3 min read

Safety is what we do together

4 min read

World Environment Day: ISO 14001 Certified

Search