Evos and J de Jonge Mechanical Work Together on Infrastructure Renewal

1 min read time

J. de Jonge Mechanical executing a major operation at the core of the Evos installation as we completely renew an existing pump and distribution system.

In carefully planned phases, the new construction is being assembled, and existing pipeline systems are systematically decommissioned and connected to the new infrastructure. As the main contractor, J de Jonge is responsible for all civil works, steel structures, scaffolding, and piping activities.

Our team is dedicated and courageous, ensuring every step of this complex project is executed with the highest standards of precision and safety. Their expertise and careful planning drive the success of this vital operation.

Curious to learn more about this project or our unparalleled expertise?

Reach out to us via email: b.overwijk@jdejonge.com, and let us guide you through the details.

Our related

news

1 min read

Sustainability Progress 2026

1 min read

HLP Three-Spindle Pump Overhaul

1 min read

Recertified ISO 9001 & ISO 45001 in Saudi Arabia

Search