J. de Jonge JLA is proud to announce successfully passing the final examination of four Marine Loading Arms for the Rotterdam biofuels plant project. Despite the recent pause in construction of the project, our team ensured that these critical components were tested in time and in accordance with technical requirements.
Our loading arms have been carefully engineered and tested to meet the highest standards. During the engineering phase, we conducted a comprehensive clash study to prevent any operational interference. Rigorous tests at Koggehaven, in the presence of our client Worley (EPC contractor) and Shell, confirmed that the MLA’s operate flawless and all alarms and signals function perfectly, ensuring safe and reliable operations.
This Factory Acceptance Test of the JLA loading arms reflects our commitment to excellence and client satisfaction. We are immensely grateful to our dedicated team for their outstanding work and to our clients for their trust and collaboration. This support motivates us to continue delivering innovative and reliable solutions.