Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

Complete Overhaul of Centrifugal Pump in Malta

About Client

Our client operates a bunker and blending terminal in the central Mediterranean, strategically located to support East-West trade routes. They required assistance to restore a critical Ruhrpump centrifugal pump with a capacity of 1,000 m³/h at approximately 10 bar(g), which had been out of service for several years.

Our Activities

  • Complete overhaul of a single-stage centrifugal pump at our shop

Challenge

The pump had faced severe weathering, as it and its spare parts had been stored in unconditioned facilities near the seaside, leading to extensive weathering and corrosion.

 

In addition, the pump had been inactive for years, requiring not only repairs but a complete overhaul to ensure reliable performance upon reinstallation.

Scope of work

The project began with a detailed inspection and evaluation. Upon receiving the pump and spare parts at our Vlaardingen shop, a thorough inspection was conducted, and a detailed report outlining the necessary repairs was shared with the client.

 

The individual components were either repaired or completely overhauled, with all soft parts being replaced. Intermediate inspections ensured that the components met quality standards before the pump was reassembled.

 

After the final assembly, the pump underwent functionality testing followed by a long-term pressure test to identify any potential leaks. Finally, a high-quality coating was applied to protect the pump from future environmental degradation.

The Result

The pump was fully restored to optimal working condition and prepared for immediate installation at the client’s site.

 

The repairs and the applied coating ensured its durability in challenging environmental conditions, and the client expressed high satisfaction with the overhaul’s quality and the transparency of the process.