Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

Electrical Control And Instrumentation Jetty 2 For LyondellBasell

About Client

LyondellBasell Wesseling, a key location for the global chemical giant, embarked on the construction of a completely new jetty. JE&A was brought in to handle the electrical and instrumentation aspects of the project. The aim was to integrate advanced electrification systems into the new jetty while ensuring full compliance with safety standards.

Our Activities

  • E&I Basic engineering of electrification
  • E&I Detail engineering of electrification
  • Installation works of everything in scope of project (both electrification and non-electrification aspects)
  • Commissioning

Challenge

The main challenge was to design and implement a control philosophy for the jetty’s loading process that would meet LyondellBasell’s specific operational requirements. This included developing a base control system design and adapting it to the client’s needs. 

Scope of work

JE&A was tasked with grounding and earthing, cable routing and installation, and setting up a gas detection system. The team designed and implemented the control system, including a ship/shore connection. A custom engineering design was delivered for the ship/shore connection to ensure seamless operation.

 

The project also integrated ship earthing systems and camera systems within the jetty’s infrastructure. Furthermore, the installation included electrical heat tracing, instrumentation for tank level measurement, temperature and pressure monitoring, and a new lighting system. The lighting system was installed in compliance with Natura 2000 regulations.

The Result

The project successfully delivered a fully integrated electrification system for the new jetty, with all systems functional.

 

Effective communication between JE&A and LyondellBasell ensured that the project stayed on schedule, and completed the project within the agreed deadline.