!
JMEC finished the preparation for the second phase of a major project for one of our customers in the port of Antwerp. JMEC worked on the 3D concept and detailed engineering, performed the phase two piping and structural clash check as well as the isometrics for (pre-)fabrication.
#JdeJonge #JMEC #engineering #Antwerp #3Dconcept #project