Show Project InfoHide Project Info

PCQ2

Total Integrated Jetties PCQ2 project in Saudi Arabia

Client: Sabic, PCQ2, Saudi Arabia, Al Jubail
Date: Q2 2014
EPC Contracter: China Chengda Engineering Company
Quantity: 5 fully integrated Hose Towers
Capacity: 40 knuckle type loading arms , 5 vapour return reels and 6 MLA
Sizes: 6, 8, and 10 inch
Contact information: Mike Sies

PCQ2 Project

01. Our Process

Jubail Chemicals Storage and Services Company (JCSSC) is a joint venture between SABIC and Royal Vopak.

The newly build 568,000 cbm tank terminal in the King Fahd Industrial Port is located in Al-Jubail and serves one of the biggest petrochemical complexes in the world. The terminal is connected via 5 Births which are equipped with 5 fully integrated hosetowers containing an average of 36 hose loading arms, 21 x 12 inch Marine Loading arms, 25 x vapour recovery hose reels and 5 x meassure booms. JLA was responsible for the complete engineering, construction and installation on site

Location

Saudi Arabia

Business Unit

J. de Jonge Specialties

JLA Loading Technology

JMEC Engineering

Quick Contact

Mike Sies: m.sies@jla.nl

02. Extra info

The terminal is built using state of the art technology and is fully equipped to comply with all international and local safety, security, health and environmental regulations and requirements.