Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

Successful Turnaround at Neste Oil Porvoo

About Neste Oil Porvoo

Neste Oil Porvoo enlisted our team for the mechanical turnaround of their HF Alky factory within a strict 4-week timeline. The scope involved extensive mechanical works on over 100 heat exchangers, ensuring the plant could return to optimal operation promptly.

Our Activities

  • Mechanical works
  • Pressure testing
  • Bundle pulling

Challenge

The project posed multiple challenges, including working with hazardous HF Alkylation chemicals, which required adherence to stringent safety procedures and the use of specialized protective equipment. Additionally, extreme weather conditions—ranging from +15°C to -5°C and including 15 cm of snow—resulted in lost working days.

 

The turnaround’s already short timeframe was further compressed by a delayed factory handover, reducing the actual work period by 1.5 days.

Scope of work

The turnaround focused on mechanical operations for over 100 heat exchangers, varying in diameter from 50 cm to 250 cm. This included spading and ensuring the plant’s safe shutdown, disassembling components like bonnets, channels, and covers, and pulling bundles. Coordination with the spray station and laydown area was critical for seamless handling.

 

After inspection and approval by Neste Oil, the components were reassembled, pressure-tested, and reinstalled to prepare the plant for reactivation.

The Result

Despite losing 3.5 working days due to late access and adverse weather conditions, the project was completed successfully one day ahead of schedule. This achievement was made possible by efficient planning, adherence to safety protocols, and the dedication of the team.

 

The turnaround reinstated the HF Alky factory to full operational capacity, meeting Neste Oil’s high standards.